isurv

Building value from knowledge

A major feature of defects claims litigation is the Scott Schedule. This can be a particularly useful way of establishing the linkage between cause and effect in any given set of circumstances.
This is a typical Scott Schedule providing the landlord's item-by-item claim schedule and the tenant's item-by-item response.

More information:
Design and scope

  • Scott schedule
  • DOC (DOC)
  • Size: 60.5 KB
  • Estimated download time: (56k = 9 secs)
  • Scott schedule
  • PDF (PDF)
  • Size: 29.17 KB
  • Estimated download time: (56k = 5 secs)